Tags » Production

Posts
ebenn001 wrote: Week 6 Final Assembly.
This week I completed the assembly of the proof of concept foam cutter. Aluminum brackets where fabricated and installed onto a wood frame to hold the stepper motors. Set screws and couplings where acquired and installed to fix the 3/8-16 all th (More)