Tags » foam cutting

Posts
jbrit003 wrote: Blog Post 9
Week 9: Very behind schedule, I have failed to produce a wing its only a matter of time before I am voted off the island. I am not sure it can actually been done on this sort of scale without some specialized equipment. I underestimated the extra wor (More)
This week was a firm week of follow through for the group. Construction of the balsa wing begun and the laser cutter and foam cutter were put to good use in regards to the foam wing. Molds were made and foam cutting was practiced. Airfoils were teste (More)